Case Study — Hove Central Development

Creating a regulator-ready position across a 5-building HRB portfolio


Project Four supported the Principal Accountable Person (Sackville Street OpCo Ltd) in delivering Safety Case Reports across five Higher Risk Buildings at the Hove Central development, a Build-to-Rent scheme operated by Moda Living.

5 Higher Risk Buildings (HRBs)
167 Up to 167 residential units per building
Mixed-use Development with shared infrastructure
Live Delivered across a multi-building scheme
Ahead of programme Completed ahead of key programme pressure

The challenge


A newly completed development comprising multiple HRBs required:

  • Alignment of information across buildings and shared systems
  • Clear demonstration of how fire and structural risks are managed
  • Consistency across buildings of different scale and complexity
  • A position that could stand up to regulatory scrutiny

While information existed, it needed to be structured, validated and translated into a coherent Safety Case position.

What we did


  • Reviewed and structured available information across all buildings
  • Carried out gap analysis against regulatory expectations
  • Developed Safety Case Reports covering: fire and structural risk, safety management systems, emergency arrangements, resident engagement and mandatory occurrence reporting
  • Ensured consistency of approach across the portfolio
  • Delivered within a compressed timeframe

Value delivered


Created a position the client can stand behind

Clear, evidence-backed Safety Case for each building. Structured and defensible approach across the portfolio.

Improved clarity and reduced risk

Gaps, risks and required actions clearly identified. Reduced uncertainty around compliance and expectations.

Enabled forward progression

Clear route towards Building Assessment Certificate readiness. Structured foundation for ongoing PAP responsibilities.

Delivered at scale and pace

5 Safety Case Reports across a complex development. Completed ahead of programme pressure.

Key services delivered


  • Safety Case Report development
  • Gap analysis and regulatory alignment
  • Safety Management System (SMS) review
  • Resident Engagement Strategy review
  • Mandatory Occurrence Reporting (MOR) review

Project Four helped us turn a complex set of buildings and information into something clear, structured and manageable. We now have a position we understand and can confidently stand behind.

Sackville Street OpCo Ltd — Principal Accountable Person

Want a position you can stand behind?


Start with a Gap Analysis to understand where you stand and what to do next.